JavaScript is disabled. Please enable to continue!
.

Mobile search icon
Testing and Inspection >> Extinguishing Systems >> Water mist nozzle component tests

Water mist nozzle component tests

Sidebar Image

We conduct component tests for water mist nozzles in accordance with IMO Resolution A.800(19) and IMO MSC/Circ.1165. In the guidelines several different test methods are presented for evaluating water mist nozzle performance. Our scope of accreditation (see FINAS site) includes following component test methods.

A.800

1165

Test method

5.2

4.2

Visual examination

5.3

4.3

Body strength test

5.4

4.4

Leak resistance and hydrostatic strength tests

5.5

4.5

Functional test

5.6

4.6

Heat responsive element operating characteristics:

5.6.1

4.6.1

 - Operating temperature test 

5.7

4.7

Heat exposure tests:

5.7.1

4.7.1

 - Glass bulb nozzles

5.7.2

4.7.2

 - All uncoated nozzles

5.7.3

4.7.3

 - Coated nozzles

5.8

4.8

Thermal shock test for glass bulb nozzles

5.9

4.9

Strength tests for release elements:

5.9.1

4.9.1

 - Glass bulbs

5.10

4.10

Water flow test

5.12

4.11

Corrosion tests:

5.12.1

4.11.1

 - Stress corrosion test for brass nozzle parts

5.12.2

4.11.2

 - Stress-Corrosion Cracking of stainless steel nozzle parts

5.12.3

4.11.3

 - Sulphur dioxide corrosion test

5.12.4

4.11.4

 - Salt spray corrosion test

5.12.5

4.11.5

 - Moist air exposure test

5.13

4.12

Nozzle coating tests:

5.13

4.12.2

 - Low-temperature test

5.14

4.13

Heat resistance test

5.15

4.14

Water hammer test

5.16

4.15

Vibration test

5.17

4.16

Impact test

5.18

4.17

Lateral discharge test

5.19

4.18

30-day leakage test

5.20

4.19

Vacuum test

5.21

4.20

Clogging test

 

In addition to test methods listed above customized test program in accordance with other test procedures is possible.

Contact our experts for more information.